The Mayor of Bishkek Checked the Readiness of the CHPP for Operation in Frost Conditions

Марина Онегина Society
VK X OK WhatsApp Telegram
The Mayor of Bishkek checked the readiness of the CHPP for operation in freezing conditions
In low temperatures, the Mayor of Bishkek, Aibek Junushaliev, along with his deputy Nurgazy Kurmanbekov, conducted an inspection at the Bishkek CHPP.
Photo of the Bishkek Mayor's Office
According to information from the press service of the mayor's office, during the visit, the leadership familiarized themselves with the temperature regimes and electrical loads, as well as checked the station's readiness to operate under increased demand.

Emergency teams at the CHPP have been strengthened, round-the-clock duty of staff has been organized, and strict control over the condition of the equipment has been implemented.

As a result of the inspection, the mayor emphasized the importance of special monitoring of the operation of the heat and power plant to ensure stable heating and energy supply for the city's residents during the cold period.
VK X OK WhatsApp Telegram

Read also: