The construction of a kindergarten continues in the Birimdik-Kut residential area.

Арестова Татьяна Education
VK X OK WhatsApp Telegram
In Birimdik-Kut, the construction of a new kindergarten for 280 children is underway.

According to the press service of the Bishkek city administration, internal finishing works are currently being actively carried out at the construction site. Workers are laying tiles in the bathrooms and are also working on the facade finishing.

The project includes the construction of a two-story building with a total area of 2,927 square meters, located on a plot of land measuring 0.8 hectares. The territory of the kindergarten will be equipped with 9 playgrounds, and a metal fence 2.5 meters high will be installed around the entire perimeter.

The first floor of the building will include sleeping and playrooms for six groups, a cafeteria, a kitchen, a medical office, sanitary facilities, and staff rooms, as well as utility and technical areas. The second floor will be designated for sleeping and playrooms for another six groups, the director's office, halls for music and physical education classes, as well as storage and auxiliary rooms.

The construction work is being carried out by the contracting organization OsOO "PSO Adis Stroy."
VK X OK WhatsApp Telegram

Read also: