
According to the information, inspectors from the State Architectural and Construction Control conducted unscheduled inspections of the facilities located at 183a Turdaliev Street.
Photo by the Ministry of Construction
During the inspection, violations of safety requirements and technical regulations were identified at the construction site. As a result, a protocol was drawn up against the company "Altyn Kazyq Kurolysh Key Ji," which was fined 200 thousand soms.
The Ministry also noted that inspections are ongoing throughout the country to strengthen control over construction quality and compliance with mandatory norms by developers.