According to him, "a new bridge over the technical channel of the TEU was opened on Auezov Street in December, and all the pedestrian crossing lines have already worn off. This creates risks for road users. Most likely, the markings were done with regular paint, whereas standards require the use of a special thermoplastic mixture with reflective additives."









Additionally, he noted that "the asphalt on the southwestern side of the bridge connecting to Chuy Avenue has sunk. Now, where the pedestrian markings were drawn, a large puddle has formed."



