In his speech, he specified the locations of the new schools and additional buildings.
In Bishkek, the following constructions are planned:
- A school for 750 students in the Birimdik Kut residential area;
- A school for 750 students in the Altyn Ordo residential area;
- A school for 750 students on a 100-hectare plot in the village of Novopavlovka;
- A school for 750 students in the village of Orto Say;
- A school for 750 students in the Ulan microdistrict;
- A school for 360 students in the Kelechek residential area;
- Buildings for 450 students in the Alamedin-1 microdistrict (School No. 38);
- A school for 1000 students in the Ala-Too residential area;
- Buildings for 360 students in the 11th microdistrict (School No. 63);
- Buildings for 360 students on Koybagarov Street (School No. 26);
- A school for 650 students in the Kasym residential area (School No. 83);
- A school for 275 students in the village of Maevka.
As for the Chui region, one school will also be built in the Issyk-Ata and Alamedin districts.
According to Imanakun uulu, the implementation of the project will begin in 2026 and be completed in 2029, with two years allocated for construction and one year for the warranty period.