In Bishkek, the first pilot project for the integration of solar panels and BESS energy storage systems was presented.

Марина Онегина Exclusive
VK X OK WhatsApp Telegram
- The presentation of a new pilot project for the installation of a solar photovoltaic station with a BESS energy storage system took place in Bishkek. This information was disseminated by the press service of the Ministry of Economy.

The project was implemented with the support of the Ministry of Economy and Commerce.

The technical parameters of the new installation:


The system operates in two modes: grid-connected (on-grid), which allows for peak load smoothing and optimization of electricity consumption, and off-grid, providing power supply to the facility and operation of the microgrid during emergency outages.

The agency noted that the implementation of such pilot projects contributes to the creation of a practical basis for the development of a green economy, the introduction of modern energy technologies, and the enhancement of the resilience of the energy infrastructure in the country.

VK X OK WhatsApp Telegram

Read also: