Tram through the south of Bishkek: a new line is planned to be built from Microdistrict 12 to the center

Сергей Мацера Society
VK X OK WhatsApp Telegram
As part of the master plan for the development of Bishkek, the construction of a new tram line is planned, which will start from the 12th microdistrict and move towards the city center. The continuation of the route is expected to go along Kyiv Street, with the final stop at the Osh market.
Photo 24.kg
According to the city hall, the details of the project implementation, including the construction sequence and specific routes, will be determined in the next stages of design. These aspects will also be considered when creating the feasibility study for the tram lines.

Local authorities emphasize that the tram will become an important element for the development of public transport in Bishkek and will help reduce the load on the street network of the capital.

In accordance with the master plan, tram lines will be organized on a dedicated track, which, combined with the use of high-capacity rolling stock, will increase the carrying capacity of the tram line threefold compared to trolleybuses.
VK X OK WhatsApp Telegram

Read also:

The railway in Bishkek will not be relocated.

The railway in Bishkek will not be relocated.

The city hall of the capital of Kyrgyzstan reported that the relocation or elimination of railway tracks in Bishkek is not planned. This information became known during the discussion of the city’s...

Write a comment: